Re: Rate Problem

$
0
0
Sarang wrote:
For 1 hour-

Machine A rate- 2000 envelopes
Machine B+C rate- 2400 envelopes
Since A + C = 3000 envelopes A's rate is 2000 envelopes as above, C has a rate of 1000 envelopes per hour.
Which makes machine B's rate as 1400 envelopes per hour.

Thus, it will take 8 hours to manufacture 12000 envelopes.

Answer:-E


I did this but shouldn't the work take 9 hours instead?
In 8 hours machine B would have made 1400 * 8 = 11200 envelopes.
In order to make 12000 it would require a fraction of an hour to create 200 more envelopes.
Am I mistaken?